Site Prep

Protect the home and set up a safe workspace before demo.

When to Use This

First thing on site, before any window or door is touched.

Tools & Materials

  1. Plastic sheeting
  2. Floor tarps
  3. Carpet guard
  4. [YOUR INPUT]

Steps

[VIDEO]
  1. Clear a minimum 3 feet of interior space around each opening.
  2. Cover floors under and around work areas with protection.
  3. Place tarps under every inside opening being installed.
  4. Cover nearby furniture and valuables with plastic.
  5. Secure pets away from the work zone.
  6. Introduce the crew to the homeowner if present.
  7. [YOUR INPUT] — Additional site prep steps.

Quality Standard

Home is protected. Customer knows what to expect. Crew has room to work safely.

Common Mistakes

Non-Negotiable: Cover the home — plastic and tarps under every inside opening. See all Non-Negotiables
Don't make coverage promises on site. Check this guide first, then call Tom (Production Manager).
Tips & Tricks
  • Fast floor protection setup — [EXPAND LATER]
  • Pet / homeowner workarounds — [EXPAND LATER]