Retrofit Installation

AVW's most common method — new unit into existing frame, moisture barrier preserved.

When to Use This

When the existing frame is sound and the job calls for retrofit per the work order.

Tools & Materials

  1. Reciprocating saw / demo tools
  2. Level
  3. Shim stock (flat trim)
  4. Screws
  5. Sealant / back-bead
  6. Beauty bead supplies
  7. Trim fin material (when required)
  8. [YOUR INPUT]

Steps

[VIDEO]
  1. Complete site prep and verify measurements (see Before the Job).
  2. Remove existing sash and meeting rail — leave frame intact.
  3. Check opening: level, plumb, flush on all four planes.
  4. Trim or grind excess frame material if needed — preserve sealant barrier.
  5. Apply back-bead sealant around the opening.
  6. Set unit with laminated flat trim shims on bottom — not wood.
  7. Secure to framing with screws per AVW method.
  8. Apply beauty bead between fin and exterior stucco.
  9. Complete interior finish (see Interior Finish).
  10. [YOUR INPUT] — Additional retrofit steps.

When to Trim Fins

Trim fins are required on retrofit when the exterior is not flush stucco or the existing frame is a pop-out frame.

[VIDEO] — How to trim fins

Discretion

Some retrofit conditions call for crew judgment on site. When in doubt, check this section first, then call Tom (Production Manager).

Quality Standard

Unit sits level and plumb. Sealant continuous. Frame concealed cleanly inside and out.

Common Mistakes

Non-Negotiable: Use laminated flat trim for bottom shims — not wood. See all Non-Negotiables
Tips & Tricks
  • Trim fin fit — [EXPAND LATER]
  • Sash removal tricks — [EXPAND LATER]
  • Frame preservation — [EXPAND LATER]
  • Screw placement — [EXPAND LATER]